Master Planning (MRP) with Dynamics 365

Dynamics 365 master planning helps you anticipate your needs, plan your resources and secure your production. You adjust your procurement, optimize your capacity and manage your operations with clear, real-time visibility.

The challenges of MRP planning

Without reliable master planning, companies suffer delays, overstock or stockouts. A lack of coordination between sales, production and procurement leads to reactive decisions that are costly and hard to control.

  • Lack of visibility into requirements and capacities
  • Error-prone manual planning
  • Delays in production or procurement
  • Poor coordination between teams
  • Frequent overstock or stockouts
Our answer with Dynamics 365 and FiveForty

Master Planning with Dynamics 365 SCM

Dynamics 365 Supply Chain Management provides comprehensive master planning to anticipate needs, adjust procurement and synchronize operations. The system analyzes demand, inventory, supplier lead times and production capacity to generate a reliable plan. Planned orders, alerts and recommendations make decisions more accurate. Master planning relies on real-time data, which improves the flow of operations and reduces the risk of stockouts. By centralizing all key information, Dynamics 365 provides clear and consistent management of your supply chain.

Our FiveForty expertise

FiveForty configures your master planning by harmonizing your data, business rules and planning processes. We adapt MRP/MPS parameters and optimize your procurement lead times, capacities and logistics cycles to make your plans more reliable. With our functional and technical expertise, we help your teams understand planning logic and put best practices in place. Our people-focused, pragmatic approach ensures fast and lasting adoption of master planning. With FiveForty, you gain precision, foresight and operational efficiency.

Key features of Dynamics 365 Master Planning

  • Integrated MRP / MPS planning
  • Intelligent requirements calculation
  • Suggested orders (purchase, production, transfer)
  • Simulation and analysis of planning impacts
  • Capacity and constraint management
  • Complete visibility on inventory and lead times
360° Solutions & 180° Vision

erp & chill

Why choose FiveForty?

Solutions 360°

From integration to maintenance.

Vision 180°

Clear management, smooth reporting and shared decisions.

Zero stress

Well-managed processes and a team that is always there to listen.

VIP network

Personal, responsive and always cheerful support.

Configuring your master planning properly

The quality of the plan depends more on the parameters than on the power of the engine.

Net change and regenerative planning

Net change calculation recalculates only what has changed; regenerative planning rebuilds the entire plan. The first suits daily use, the second in-depth replanning. Confusing them produces inconsistent plans.

Lead times and replenishment policies

Each item carries its lead time, minimum quantity, order multiple and policy: on demand, reorder point or safety stock. These parameters determine how relevant the suggestions are.

Safety stock and coverage

The safety stock level must reflect how critical the item is and the actual variability of the supplier lead time, not a uniform rule applied to the entire catalog.

Planning horizon and scheduling

Defining how far out the plan is firm, where it becomes a forecast and from when it is open avoids constantly replanning orders that have already been released.

Forecasts and forecast consumption

Actual orders must consume forecasts; otherwise requirements pile up and the plan greatly overestimates the quantities to procure.

Action messages and exceptions

Expedite, postpone, cancel: the engine generates adjustment suggestions. Processing them regularly is what keeps the plan aligned with reality.